Water/Sewer Connection Fees PDF Print E-mail
Water Services
WATER SYSTEM CONNECTION FEES
(Water Meter Application)
 
North Fulton Water System (North of the Chattahoochee River, Including Alpharetta)
(Normal house connection requires 5/8” meter size)
 

 
NORTH FULTON
Water Meter
Size
System
Capacity Fee
Water Meter
Cost
TOTAL Water System Connection Fees
5/8”
$1,015
$1,350
$2,365
5/8” Drop In
$1,015
$135
$1,150
3/4"
$1,015
$1,370
$2,385
3/4" Drop In
$1,015
$155
$1,170
1”
$1,691
$1,740
$3,431
1” Drop In
$1,691
$280
$1,971
1 1/2”
$3,383
$2,720
$6,103
2”
$5,412
$3,970
$9,382
3”
$10,148
$5,235*
$15,383
4”
$16,913
$5,578*
$22,491
6”
$33,827
$12,215*
$46,042
8”
$54,123
$15,953*
$70,076

*Labor and equipment cost not included.
 
Water Meter Connection Permit (Water Meter Application) purchased through the Development Services Department at time of Building Permit Issuance or at time of connection to the water system. Water System Connection applicants for properties within the cities of Roswell and Mountain Park must purchase Water Application from those cities.
 
Properties located SOUTH of the Chattahoochee River (South Fulton, Sandy Springs, Fulton Industrial Area) must apply for water service through the City of Atlanta Water Bureau.
 
 
OTHER ASSOCIATED FEES for NORTH FULTON WATER SYSTEM**
 

FIRE FLOW TEST
$100
Water Meter Replacement/Repair
(including stolen and damage meters)
5/8” - $165 1” - $330 2” - $1,600
3/4" - $185 1 1/2" - $495
Meter Box Replacement
Small - $510 Medium - $1,225
Road Bore (3/4” service)
$528 – 2 lanes $1,056 – 4 lanes
Road Bore (1” service)
$528 – 2 lanes $1,056 – 4 lanes
Road Bore (1 1/2” to 2” service)
$720 – 2 lanes $ 1,440 – 4 lanes
Road Bore (3” to 4” service)
$7,000 – 2 lanes $ 10,500 – 4 lanes
Road Bore (6” to 8” service)
$10,000 – 2 lanes $ 15,000 – 4 lanes

 
** These fees are paid to the Fulton County Public Works Department. These fees a apply to all areas NORTH of the Chattahoochee River including Unincorporated Fulton County, Roswell, Alpharetta and Mountain Park.
 
SEWER SYSTEM FEES
 

Install Sewer Tap
 
$2,400 Plus Impact Fee
Install Sewer Clean-Out
 
$1,400
Install Backflow Valve
 
$1,400

 
SEWER CONNECTION PERMIT FEES
(Normal House Connection requires 3/4” Water Service
 
 
North Fulton
South Fulton
Water Meter Size
Little River Basin
John’s Creek Sewer Basin (Effective January 1, 2004)
Big Creek Sewer Basin (Effective January 1, 2004)
Riverridge Sewer Basin (includes Cobb Surcharge)
Marsh Creek Basin ( includes Cobb Surcharge)
Long Island Creek Basin (includes Cobb Surcharge)
 
Nancy Creek Sewer Basin
(City of Atlanta)
 
 
Camp Creek Sewer Basin
Utoy Creek Sewer Basin (City of Atlanta)
Up to ¾”
 
$1,810
$3,613
$3,613
$2,454
$2,454
$2,454
$1,254
$1,810
$1,637
1”
$3,017
$5,347
$5,347
$3,290
$3,290
$3,290
$2,090
$3,017
$2,728
 
1-1/2”
$6,035
$10,839
$10,839
$5,380
$5,380
$5,380
$4,180
$6,035
$5,457
 
2”
$9,655
$17,342
$17,342
$7,888
$7,888
$7,888
$6,688
$9,655
$8,731
 
3”
$18,104
$32,517
$32,517
$13,740
$13,740
$13,740
$12,540
$18,104
16,370
 
4”
$30,173
$50,582
$50,582
$22,099
$22,099
$22,099
$20,899
$30,173
$27,283
 
6”
$60,346
$108,390
$108,390
$42,998
$42,998
$42,998
$41,798
$60,346
$54,566
 
8”
$96,553
$173,424
$173,424
$68,077
$68,077
$68,077
$68,877
$96,553
$87,306
 
*Cobb County Surcharge of $1,200 included on these figures.
 
Sewer Connection Permit purchased through the Development Services Department at time of Building Permit Issuance or at time of connection to the sewer system.
 
 
 
up
up