City of Sandy Springs

 

In accordance with state legislation, transportation improvement projects funded through the TSPLOST were divided into three priority tiers.

  • Tier 1 includes the highest priority projects in each City. The total amount allocated to Tier 1 is equal to 85% of the expected 5-year revenue.

 

Because TSPLOST is generated from local sales over a five-year period, the amount of revenue generated cannot be exactly determined. Thus, Tier 2 includes local, flexible projects within each City where the size of the project and level of investment can be adjusted based on available funding.

  • Tier 2 projects include signal timing efforts, sidewalk extensions, roadway resurfacings, and other “quick response” transportation projects. The total amount of funding allocated to Tier 2 is equal to 15% of the expected five-year revenue. Tier 1 and Tier 2 combined make up 100% of the anticipated funding.

 

Tier 3 includes the third set of priorities for each City. If projects in Tier 1 or Tier 2 are delayed, are completed under budget, or if the revenue over five-years exceeds anticipated funding due to a robust economy or increased sales, projects in Tier 3 may be addressed with TSPLOST funds.

  • Tier 3 was capped at 15% of expected five-year revenue, as the Fulton County Intergovernmental Agreement (IGA) sets 15% of the anticipated revenue as the maximum amount that can be collected over the 5-year period.

 

Purpose/Projects

 

TSPLOST Purpose Cost

 

SANDY SPRINGS TIER 1 PURPOSES/PROJECTS

 

Operations and Safety Improvements

$18,000,000

Traffic Efficiency improvements

 

Pedestrian and Bike Improvements

$28,500,000

Perimeter Transit Last Mile Connectivity

 

Sidewalk Program

 

Mt. Vernon Highway Multiuse Path

 

Congestion Relief

$41,649,009

Johnson Ferry Road/Mt. Vernon Highway Efficiency Improvements

 

Hammond Drive, Phase 1 Efficiency Improvements

 

TIER 1 TOTAL PURPOSE COSTS

$88,149,009

   

SANDY SPRINGS TIER 2 PURPOSES/PROJECTS

 

Pedestrian and Bike Improvements

$12,500,000

Perimeter Transit Last Mile Connectivity

 

Sidewalk Program

 

Mt. Vernon Highway Multiuse Path

 

SR 400 Trail System

 

Roberts Drive Multiuse Path

 

Congestion Relief

$350,991

Johnson Ferry Road/Mt. Vernon Highway Efficiency Improvements

 

Maintenance and Safety Enhancements

$2,704,716

Roadway Maintenance and Paving

 

TIER 2 TOTAL PURPOSE COSTS

$15,555,707

   

SANDY SPRINGS TIER 3 PURPOSES/PROJECTS

 

Maintenance and Safety Enhancements

$15,617,086

Roadway Maintenance and Paving

 

TIER 3 TOTAL PURPOSE COSTS

$15,617,086

   

TOTAL SANDY SPRINGS COSTS - ALL PURPOSES FOR TIERS 1-3

$119,321,802

City of Sandy Springs